9
! [ENGLISH]
Hello, how are you? Today I want to show you a job we did yesterday, it was a fix or rather something that was left half done by a plumber, we wanted to complete and leave the sewage box as best as possible so that it does not become clogged again in the future, because recently it was clogged and the sewage was leaking through the wall of the house that goes to the street and when I bought the house and sent to build the master never found the box but connected the entire pipe to a pipe to find such a character of course this would bring damage and if after eight years that I already fulfilled in my house was where it started to happen these things so we decided to call a plumber which, He was very smart and he was able to find the box and uncover it, he made the lid of the box because it didn't have a wall, We also had to cover the floors, because in the part where the box is, it is on the street and every time it rains, the mud comes out and leaves it all over the block ha, ha, ha, ha, we had to pour cement to remove these inconveniences for us and for the neighbors, I know that the big floor was not left, well in the future it is planned to remove all the old tile and put new tile clear that this is the platform so we have no concern in the porch if we must buy more cement to finish, but the same to the floor below is planned to chop and add tile I emphasize that the floors must carry a mesh, but we did not add to any floor because we had no ha, ha, ha, ha I hope you like the video until next time
! [SPANISH]
video grabado con mi celular huawei y9s
video editado en capcut
miniatura editada en canva Enlace
Traductor utilizado Deepl.com versión gratuita
Musica del video Enlace
Separador obsequiado
! [ENGLISH]
video recorded with my huawei y9s
video edited in capcut
thumbnail edited in canva Enlace
Used translator Deepl.com free
Music of the video LINK
complimentary separator
Comments:
Reply:
To comment on this video please connect a HIVE account to your profile: Connect HIVE Account